Verlagsgruppe Bahn541901
Series 03
Eisenbahn Journal Special 1/2019 - Series 03 - Technology, use, museum locomotives
No longer in the shop
Description
Eisenbahn Journal Special 1/2019 - Series 03 - Technology, use, museum locomotives
92 pages, clip binding, DIN A4 format, approx. 140 illustrations
Author: Konrad Koschinski
Mit 298 machines was the 03 series the most built German "Pacific". The Deutsche Reichsbahn opted for the procurement because the series 01 express train steam locomotives, which were put into service from 1925, could only be used on routes that had already been upgraded to an axle pressure of 20 tonnes. To comply with a maximum axle pressure of around 18 tonnes, the 03 got a smaller and somewhat less efficient boiler than the 01. To study the effectiveness of Stromlinienverkleidungen in practice, were the 03 154 with a partial and the 03 193 with a full fairing
After the end of the Second World War, 150 aircraft were in the western zones and 80 in the Soviet occupation zone. While the Plandienst at the German Federal Railroad ended in 1972 at the outlet Bw Ulm, received in the GDR 52 locomotives of the series 03 in the years 1968 to 1975 still a Rekokessel of decommissioned P 10. Despite this late investment, the DR 1979, the scheduled use set. The 03 2002 was used as the last Reichsbahn-03 from the Bw Güsten until 21st September 1980.
This new special edition of the Eisenbahn-Journal-Redaktion dedicates a chapter of its own to the remaining 03 in Poland and the Soviet Union 03. The special issue is extensively illustrated in the usual way, partly in color, and contains numerous first published photos.
92 pages, clip binding, DIN A4 format, approx. 140 illustrations
Author: Konrad Koschinski
Mit 298 machines was the 03 series the most built German "Pacific". The Deutsche Reichsbahn opted for the procurement because the series 01 express train steam locomotives, which were put into service from 1925, could only be used on routes that had already been upgraded to an axle pressure of 20 tonnes. To comply with a maximum axle pressure of around 18 tonnes, the 03 got a smaller and somewhat less efficient boiler than the 01. To study the effectiveness of Stromlinienverkleidungen in practice, were the 03 154 with a partial and the 03 193 with a full fairing
After the end of the Second World War, 150 aircraft were in the western zones and 80 in the Soviet occupation zone. While the Plandienst at the German Federal Railroad ended in 1972 at the outlet Bw Ulm, received in the GDR 52 locomotives of the series 03 in the years 1968 to 1975 still a Rekokessel of decommissioned P 10. Despite this late investment, the DR 1979, the scheduled use set. The 03 2002 was used as the last Reichsbahn-03 from the Bw Güsten until 21st September 1980.
This new special edition of the Eisenbahn-Journal-Redaktion dedicates a chapter of its own to the remaining 03 in Poland and the Soviet Union 03. The special issue is extensively illustrated in the usual way, partly in color, and contains numerous first published photos.
Specifications
ISBN978-3-89610-712-1
Reference data
Manufacturer’s item no.541901
EAN2000000318711
Released07.03.2019
ScaleNeutral
Era–
Power system–
Railway company–
Market value
Coming soon
The modellbahn·fokus market value index will in future show reference values for both available and discontinued models — transparently derived and continuously updated.
Comments from members (0)
No comments on this model yet – be the first.
Only signed-in members can write comments. Sign in now
Report an error or suggest an addition
Do you know this model better? The editors review every note.
Please sign in to suggest a correction or an addition.



