modellbahn·fokusThe digital reference archive of model railways · A project by Modellbahnshop Lippe
EN
Home› Manufacturers› Faller› 120149
Faller120149

Cinder removing facility

Cinder removing facility, Epoche II

In the shop

Description

Cinder removing facility

Kit includes a gantry crane, 2 heated swivel water spouts (DB NW 200), 2 slag hoppers, 1 ground plate (344 mm) with slag pit, rolling slag carriage, and bucket. Above the slag pit the ground plate is provided with two driving rails. It can be connected to all types of tracks, even those with middle conductor, excepted Märklin’s C track. Combining two inspection pits (120136) allows to build a two-track deslagging plant with a parallel track distance of 67 mm, matching that of the bunker (120148). Such an installation allows the gantry crane to span 3 tracks 2 slag pits and 1 track for slag wagons.

Specifications

Dimensions (LxWxH)344 x 147 x 102 mm
Package content69 single parts in 2 colours and 1 construction instruction

Reference data

Manufacturer’s item no.120149
EAN4104090001490
ScaleH0 (1:87)
EraII
Power system–
Railway company–

Market value

Coming soon

The modellbahn·fokus market value index will in future show reference values for both available and discontinued models — transparently derived and continuously updated.

Comments from members (0)

No comments on this model yet – be the first.

Only signed-in members can write comments. Sign in now

Report an error or suggest an addition

Do you know this model better? The editors review every note.

Please sign in to suggest a correction or an addition.