EK-Verlag6025
VT 10.5 series
The VT 10.5 series - The DB's "Senator" and "Komet" articulated multiple units
No longer in the shop
Description
The VT 10.5 series - the "Senator" and "Komet" articulated multiple units of the German Federal Railway.
When the lifting of the ban on the development and construction of new rail vehicles imposed by the Allies after the end of the war in 1945 became apparent, the first contacts between Franz Kruckenberg, the pioneer of the high-speed rail concept, and the Reichsbahn in the United Economic Area, later known as the Deutsche Bundesbahn (DB), were made in March 1948. Its president, Frohne, campaigned for the continuation of the successful pre-war railcar construction and significantly supported the concept of light-metal articulated multiple units that resulted from the technical discussions. In order not to restrict the creativity of the industry, the involvement of the DB's technical central offices was limited to monitoring legal and technical safety requirements.
Linke–Hofmann–Busch (LHB) built a day train on behalf of the DB (VT 10 501) and Wegmann built a night train (VT 10 551) on behalf of the German Sleeping Car and Dining Car Company (DSG). The two initially seven-car trains, each with two power cars and five intermediate cars, had a largely identical drive concept consisting of truck engines, hydromechanical transmissions and cardan shaft transmission to the driving wheel sets. While the sleeping car train rested on conventional Jakobs bogies, the day train received the single-axle running gear proposed by Kruckenberg for the separation points of the individual sections.
The book deals in detail with the innovations that were remarkable for the time and were also visible to rail passengers: short, wider carriages allowed for more comfort in the seats, secure lockers for luggage and coats created a generously free interior, air conditioning and an enclosed toilet were implemented for the first time.
The two trains, which were completed under great time pressure, were presented for the first time at the German Transport Exhibition in Munich in 1953 and attracted a great deal of attention. Demonstration runs in southern Germany and later in Yugoslavia and Greece followed. The trains became advertising vehicles for the new Federal Republic, although not all expectations placed on the trains were fulfilled and they were withdrawn from scheduled service relatively early on. For the companies involved, such as LHB, MAN and Wegmann, they opened the door to further projects, in particular the DB TEE train (VT 11.5), which was ready for use as early as May 1957.
approx. 200 pages with approx. 200 illustrations; 210 x 297 mm; Author: Heinz Kurz
- New in 2016 -
When the lifting of the ban on the development and construction of new rail vehicles imposed by the Allies after the end of the war in 1945 became apparent, the first contacts between Franz Kruckenberg, the pioneer of the high-speed rail concept, and the Reichsbahn in the United Economic Area, later known as the Deutsche Bundesbahn (DB), were made in March 1948. Its president, Frohne, campaigned for the continuation of the successful pre-war railcar construction and significantly supported the concept of light-metal articulated multiple units that resulted from the technical discussions. In order not to restrict the creativity of the industry, the involvement of the DB's technical central offices was limited to monitoring legal and technical safety requirements.
Linke–Hofmann–Busch (LHB) built a day train on behalf of the DB (VT 10 501) and Wegmann built a night train (VT 10 551) on behalf of the German Sleeping Car and Dining Car Company (DSG). The two initially seven-car trains, each with two power cars and five intermediate cars, had a largely identical drive concept consisting of truck engines, hydromechanical transmissions and cardan shaft transmission to the driving wheel sets. While the sleeping car train rested on conventional Jakobs bogies, the day train received the single-axle running gear proposed by Kruckenberg for the separation points of the individual sections.
The book deals in detail with the innovations that were remarkable for the time and were also visible to rail passengers: short, wider carriages allowed for more comfort in the seats, secure lockers for luggage and coats created a generously free interior, air conditioning and an enclosed toilet were implemented for the first time.
The two trains, which were completed under great time pressure, were presented for the first time at the German Transport Exhibition in Munich in 1953 and attracted a great deal of attention. Demonstration runs in southern Germany and later in Yugoslavia and Greece followed. The trains became advertising vehicles for the new Federal Republic, although not all expectations placed on the trains were fulfilled and they were withdrawn from scheduled service relatively early on. For the companies involved, such as LHB, MAN and Wegmann, they opened the door to further projects, in particular the DB TEE train (VT 11.5), which was ready for use as early as May 1957.
approx. 200 pages with approx. 200 illustrations; 210 x 297 mm; Author: Heinz Kurz
- New in 2016 -
Specifications
Abmessung (BxH)210 x 297 mm
Reference data
Manufacturer’s item no.6025
EAN9783844660258
ReleasedQ2-Q3/2016
ScaleNeutral
Era–
Power system–
Railway company–
Market value
Coming soon
The modellbahn·fokus market value index will in future show reference values for both available and discontinued models — transparently derived and continuously updated.
Comments from members (0)
No comments on this model yet – be the first.
Only signed-in members can write comments. Sign in now
Report an error or suggest an addition
Do you know this model better? The editors review every note.
Please sign in to suggest a correction or an addition.


