Description
Boeing 787-9 Dreamliner Roll-out Livery, epoch VI.
The first Dreamliner with the 20 foot (6 m) fuselage stretch was rolled out of the Boeing paint hangar at the end of July, 2013. Starting fall, the aircraft will commence a six-month test program. The first aircraft are scheduled to be delivered by mid 2014.
Collection: Wings.
The first Dreamliner with the 20 foot (6 m) fuselage stretch was rolled out of the Boeing paint hangar at the end of July, 2013. Starting fall, the aircraft will commence a six-month test program. The first aircraft are scheduled to be delivered by mid 2014.
Collection: Wings.
Specifications
Product LineWings
Reference data
Manufacturer’s item no.526173
EAN4013150526173
ReleasedQ1/2014
Scale1:500
EraVI
Power system–
Railway company–
Market value
Coming soon
The modellbahn·fokus market value index will in future show reference values for both available and discontinued models — transparently derived and continuously updated.
Comments from members (0)
No comments on this model yet – be the first.
Only signed-in members can write comments. Sign in now
Report an error or suggest an addition
Do you know this model better? The editors review every note.
Please sign in to suggest a correction or an addition.



